Is the Installation Site Ready for the Equipment?
30 questions, 6 categories — assess whether the installation site is truly ready for new equipment.

Result: installation readiness
Strengths
Biggest gaps
Want certainty that the installation site is truly ready?
Request a pre-installation technical checkHow the calculation works
The checklist has 30 questions in six weighted categories: construction and space (20%), utilities (20%), logistics and access (15%), safety and compliance (15%), documentation and planning (15%) and team and commissioning (15%). Questions are rated 0–4 and the result is a weighted average of 0–100. Below 40 means the site is not ready for installation; 80 and above means fully ready.
Example: if only two 20%-weight categories are fully in order and the rest are missing, the result is 40/100, i.e. “partly ready – high risks”.
Frequently asked questions
When should I run the check?
Before ordering the machine, and again before delivery, so there is still time to fix gaps.
Who should complete the checklist?
The project manager together with the technical manager, production manager and safety specialist.
What does the result give me?
You see which categories are lagging and can build an action plan from the gaps before installation.
Related tools
Related services
Methodology and limitations
Methodology based on standard industry calculations and Maintest’s practical industrial experience. This tool provides a planning estimate and does not replace project-specific engineering assessment. This tool is a screening and planning aid developed by Maintest. Results are indicative and depend entirely on the figures and answers you enter. They are not an engineering calculation, a safety assessment or a substitute for the manufacturer’s instructions, applicable standards or professional judgement. Weights, benchmarks and default values are Maintest planning assumptions and can be adjusted to your situation. Do not use this tool as the only basis for safety-critical decisions such as lifting, electrical work or lockout procedures.
Tool version 1.0 · Updated October 2026
Related project: Production line installation in Jüri
Want certainty that the installation site is ready?
Contact us — we will respond as soon as possible.