Free tool
Maintenance Maturity Assessment
35 questions, 7 categories — assess your plant’s maintenance maturity and get personalized recommendations.

Your maintenance maturity result
Top 3 strengths
Top 3 gaps
Recommended actions
This result is an indicative assessment, not a certificate or formal audit. Critical technical and safety decisions must be confirmed by a competent specialist.
How the calculation works
The test has 35 questions in seven categories: strategy and criticality, planning and scheduling, preventive and predictive maintenance, reliability and RCA, spare parts, data and CMMS, and safety and documentation. Each question is rated 0–4 (from none to measured and continuously improved). Category weights are 10–15%, and the result is an overall score of 0–100 with a radar chart, three strengths, three gaps and recommended actions.
Example: if two of the seven 15%-weight categories are rated at maximum and the rest at zero, the overall score is 30 points, i.e. the “Initial” level.
Frequently asked questions
How long does the test take?
The 35 questions are multiple choice, so usually a few minutes to a quarter of an hour. You get the best result by completing it together with your maintenance and production managers.
What if I do not know the answer?
Choose “None”. An unanswered question counts as zero, which also shows that the topic needs attention.
What should I do with the result?
Start with the three lowest-scoring categories. The tool gives concrete recommendations for each gap, and we can help you implement them.
Related tools
Related services
Methodology and limitations
Methodology based on standard industry calculations and Maintest’s practical industrial experience. This tool provides a planning estimate and does not replace project-specific engineering assessment. This tool is a screening and planning aid developed by Maintest. Results are indicative and depend entirely on the figures and answers you enter. They are not an engineering calculation, a safety assessment or a substitute for the manufacturer’s instructions, applicable standards or professional judgement. Weights, benchmarks and default values are Maintest planning assumptions and can be adjusted to your situation. Do not use this tool as the only basis for safety-critical decisions such as lifting, electrical work or lockout procedures.
Tool version 1.0 · Updated October 2026
Want to improve your maintenance maturity?
Contact us — we will respond as soon as possible.