Factory Relocation Risk Score

Score the risk level of your factory or equipment relocation across 5 key areas.

Result: factory relocation risk score

0

Lowest-risk areas

    Highest-risk areas

      ⚠️ This is a quick initial risk assessment. For relocating a large or critical production line, we always recommend preparing a detailed relocation plan with a risk analysis and schedule together with a specialist.

      Want professional help mitigating relocation risks?

      Request a factory relocation service
      This result is an indicative decision-support aid, not a formal risk analysis or project plan.

      How the calculation works

      Risk is assessed with 17 questions in five weighted categories: planning and schedule (20%), technical complexity (25%), staff and know-how (15%), production continuity (25%), and financial and contractual risk (15%). Unlike the other checklists, a higher score means higher risk. The result is 0–100 with a radar chart: low, moderate or high risk.

      Example: if only technical complexity (25%) and production continuity (25%) are rated at maximum risk and the rest at zero, the result is 50/100, i.e. “moderate risk”.

      Frequently asked questions

      What does a high score mean?

      High risk means the relocation needs a thorough plan, prior mapping and resources. It does not mean you should not relocate.

      How can I reduce the risk?

      Map the machines and connections, label the cables, plan transport and allow a time buffer. We take these steps in our own relocation projects.

      When should I assess the risk?

      As early as possible, before signing contracts and locking the schedule.