Free tool
FAT/SAT Checklist Generator
Generate a ready-made FAT/SAT checklist for your equipment’s factory test and on-site test.
Equipment and project data
Test type
Want Maintest to help run or prepare for a FAT/SAT test?
Request installation technical supportHow the calculation works
The generator produces a printable acceptance checklist. FAT (factory acceptance test) contains 12 typical items: conformity to specification, CE marking, electrical safety, functional test, documentation, spare parts list, warranty and packaging. SAT (site acceptance test) contains 12 items: installation correctness, utilities, safety systems, load test, training, punch list and sign-off. Each row has “pass / fail / not applicable” and a comment, with signature boxes at the end.
Example: enter the machine name, supplier, model and project, select FAT and SAT – you get a ready 24-row acceptance protocol.
Frequently asked questions
What is the difference between FAT and SAT?
FAT is done at the supplier’s site before delivery, SAT at the customer’s site after installation.
Is the checklist final?
It is a general basis. Add the items specific to your machine and contract.
How do I save the protocol?
Use the browser’s print dialog and choose “Save as PDF”.