FAT/SAT Checklist Generator

Generate a ready-made FAT/SAT checklist for your equipment’s factory test and on-site test.

Equipment and project data

Test type

Supplier representative signature, date
Client representative signature, date
⚠️ This is a general, typical FAT/SAT checklist. Each specific piece of equipment and project may need additional items based on specification, safety requirements or supplier contract — adapt the list as needed before running the test.

Want Maintest to help run or prepare for a FAT/SAT test?

Request installation technical support
This result is an indicative aid, not a formal acceptance protocol or engineering document. Adapt it to your project’s actual requirements.

How the calculation works

The generator produces a printable acceptance checklist. FAT (factory acceptance test) contains 12 typical items: conformity to specification, CE marking, electrical safety, functional test, documentation, spare parts list, warranty and packaging. SAT (site acceptance test) contains 12 items: installation correctness, utilities, safety systems, load test, training, punch list and sign-off. Each row has “pass / fail / not applicable” and a comment, with signature boxes at the end.

Example: enter the machine name, supplier, model and project, select FAT and SAT – you get a ready 24-row acceptance protocol.

Frequently asked questions

What is the difference between FAT and SAT?

FAT is done at the supplier’s site before delivery, SAT at the customer’s site after installation.

Is the checklist final?

It is a general basis. Add the items specific to your machine and contract.

How do I save the protocol?

Use the browser’s print dialog and choose “Save as PDF”.