Free tool
Maintenance Plan Generator
Generate a recommended maintenance plan tailored to your equipment type and criticality.
Equipment data
Result: recommended maintenance plan
| Maintenance task | Recommended frequency |
|---|
Want a more precise, equipment-specific maintenance plan?
Request a maintenance contractHow the calculation works
You choose the machine type (CNC, conveyor, press, pump, HVAC or general) and the criticality (high, medium, low). The plan contains six standard tasks (visual inspection, cleaning, lubrication, consumables, fasteners, full inspection) and three machine-type-specific tasks. The base interval is multiplied by a criticality factor (0.5 / 1 / 1.5) and the result is shown as a frequency from daily to yearly.
Example: a CNC machine of medium criticality gives 9 tasks; at high criticality the full-inspection interval halves from 365 days to 183 days.
Frequently asked questions
Can I use the plan as it is?
It is a good basis. Refine it with the manufacturer’s manual and your own operating conditions.
Why does criticality change the interval?
A more critical machine must be checked more often to reduce the probability of failure.
Where do I find the criticality?
Use our criticality calculator.
Related tools
Related services
Want a more precise, equipment-specific maintenance plan?
Contact us — we will respond as soon as possible.